Problem
The Decarbonisation Blind-Spot
What's needed: Containerised, zero-carbon power with diesel-like uptime and response, deployable in days, at a diesel genset cost/kWh.
Solution
Unlocking Green Ammonia
CATALSYS' reactor unlocks green ammonia as a drop-in, low-cost fuel for conventional gensets.
Our value proposition is clean, low-cost, modular power using existing gensets.
Drop-in Compatible
Our CATALSYS cracker converts ammonia (NH₃) into a H₂/NH₃ mixture which burns in existing gensets.
On-Demand Power
We provide 50kW to 3+MW with rapid startup and high-efficiency power generation on-par with existing genset performance.
Cost-Competitive
The LCOE (Levelised Cost of Electricity) of the CATALSYS process is on-par with diesel gensets, using near-term green ammonia prices.
How it works
From Green Fuel to Clean Power
Ammonia is the most practical zero-carbon energy carrier at scale, with high energy density and existing logistics. However, pure ammonia doesn't burn well in conventional gensets.
CATALSYS has developed a novel reactor package that efficiently cracks green ammonia.
Illustrative Example:
A single 40ft 'hi-cube' shipping container can house up to a 1MWe generator. This setup offers 1.5 days of continuous operation at an average of 750kWe, and tanks can be 'hot swapped' without supply interruption.
How it works
Cost-Competitive with Fossil Fuels
CATALSYS LCOE can achieve effective parity with fossil fuels and is far cheaper than other green alternatives.
Levelized Cost of Electricity (£/kWh)
LCOE based on 1MWe generators, 10-year lifetime. No carbon credits or other incentives included.
Technology
Differentiated IP, De-Risked by Mature Components
Targeted Innovation
De-Risked by Mature Components
Markets
Large, Diverse, and Growing End-Markets
Our initial focus is on mid-size (100kW-3MW), grid-constrained, industrial use cases.
This serviceable available market is estimated at >$10bn in 2035, with the total off-grid market growing at 8-10% per annum.
Markets
Committed Pilots and Independent Validation
Commercial Traction
SKANSKA
Agreement with the 5th largest construction firm globally to deploy a 100kW CATALSYS generator on a UK construction site in 2026.
Asoto OU
JV agreement with a European leader in bespoke generator systems to assemble and distribute 1-3MW CATALSYS-powered generators in Europe.
SkiesFifty
JV agreement to collaborate on airport ground operations use cases.ent with a European leader in bespoke generator systems to assemble and distribute 1-3MW CATALSYS-powered generators in Europe.
Technical Validation
Team
Experienced Leadership.
Strong Technical Foundations.
Contact




